After a lot of research and seeing how much work would be involved in trying to DIY, we went ahead and arranged for a local firm to completely redesign our bathroom. here is what it looked like before the work started. The missing tiles and bath panels were a result of some of the research!

Boiler and old style small white tiles

Boiler and old style small white tiles

Electric shower over blue bath with shower curtain

Electric shower over bath with shower curtain
Electric shower over bath with shower curtain

Blue sink under the window

Sink under the window

Day 1

In just one day they had stripped the old bathroom, put in the plumbing for the new bath. built a new ceiling and the back of the new shower enclosure!


Door off and tiles stripped

Door off and tiles stripped

Sink removed and tiles stripped

Sink removed and tiles stripped

Shower enclosure structure under way

Shower enclosure structure under way

New false ceiling built

New false ceiling built

Plumbing to bath laid in

Plumbing to bath laid in

Day 2

Plastering done today.

Wall by boiler plastered and shower plumbing laid in

Wall by boiler plastered and shower plumbing laid in

Wall by door plastered ready for tiling

Wall by door plastered ready for tiling

Tiles have arrived

Tiles have arrived

New false ceiling plastered as well

New false ceiling plastered as well

Day 3

Today (Thursday) was our last day on site while the work was going on. Tiling started today

Tiles up in shower enclosure area

Tiles up in shower enclosure area

Tiling started on wall by door. NB bath is not in final position here.

Tiling started on wall by door. NB bath is not in final position here.

After our canal holiday

We then went off on a week on our canal boat (report here)and left the work to carry on without us. Quite a relief to be able to get a shower. The novelty of sponge baths at the kitchen sink soon wore off! So we arrived back the following Friday to find the workmen putting the finishing touches to the work. It looks great!!

Things to notice in the following photos include walk-in shower enclosure, shorter bath to suit AJS, mixer on the bath taps for easy hair rinsing, big mirror, downlighters, extractor fan & lots of cupboard space

Sink, vanity unit, wallunit and mirror
Walk-in shower enclosure
Boiler enclosure (with one door missinng)
Heated towel rail

A few bits left to do such as a missing cupboard door. And we need to arrange for the flooring. But the rest is fully functional!